City of Fontana Advanced Traffic Management
 
Description   Installation of conduit and fiber optic systems linking CCTV traffic monitoring systems. Installed 37,000 feet of 6 1-1/2" HDPE duct, 44,000 feet of 96 strand, and 3,000 feet of 12 strand fiber optic cable, 12 CCTV cameras, and interconnected 24 existing traffic controllers. In addition designed, installed and integrated a 5.8 GHz wireless network using Ethernet protocol to connect remote PTZ cameras and traffic signal controllers to the City's existing TMS system.
Contract No   SB No. 1103
Type   Prime
Owner   City of Fontana
Location   San Bernardino - Fontana
Estimator   Rusty B. Moore
Valuation   $2,284,321.00
Status   Completed
Start   05/03/2004
Est. Completion   11/30/2004
Completion Date   01/25/2007