Install the electronic toll collection system at 7 separate toll bridge plazas crossing the San Francisco Bay. Project included installation of all conduit, power and Fiber Optic Communication systems, violation detection cameras, electronic toll collection antennae, treadles, light curtains, patron toll displays, inductive loops and inter-building work at each plaza administration building.